Posts by Kimberly
BLYTHEWOOD PARK
DOKO MEADOWS The Town of Blythewood selected TLPGS to prepare a park Master Plan for the 25 acres surrounding the historic Town Hall. Park amenities included in the Master Plan are an entry boulevard with signage and plantings that culminates with a spray-ground water feature framed by a radial pergola and clock tower. Behind the…
Read MoreAMERITRADE COURTYARD
URBAN COURTYARD Adaptive reuse of abandoned buildings, LandPlan worked with Studio 2LR to create an inviting courtyard for the new Spa and Ameritrade Office Building.
Read MoreBIRNIE HOPE PARK
BIRNIE HOPE PARK The City of Sumter selected The LandPlan Group South to prepare a Park Master Plan and Construction Documents for the 4.3 Acres surrounding the existing Birnie Hope Center. This project was funded by CDBG and Hospitality Tax Funds. Park Amenities included a quarter-mile asphalt trail, spray fountain-Splash Pad, 3 playgrounds, gazebo, bathroom,…
Read MoreURBAN COURTYARD
URBAN COURTYARD Adaptive reuse of abandoned buildings, LandPlan worked with Studio 2LR to create an inviting courtyard for the new Spa and Ameritrade Office Building.
Read MoreWOODCREEK FARMS ENTRANCE
WOODCREEK FARMS WoodCreek Farms
Read MoreOPERA HOUSE
The LandPlan Group South was hired by the City of Sumter, SC to complete a conceptual Master Plan for the Opera House parking lot. The City is currently revitalizing their parking areas and looking to create a more pedestrian friendly and safe space downtown. The conceptual Master Plan created connections for pedestrians to access the…
Read MoreRUSSELL STREET
RUSSELL STREET The LandPlan Group South, Inc. performed conceptual design, final design, preparation of construction documents, and permitting for a four (4) block streetscape project that included drainage, sidewalk, utility relocation, and landscaping with a contract amount of $1,035,000. There is a $500,000 CDBG grant that funded a portion of this work and the construction…
Read MoreCOLLEGE AVENUE
STREETSCAPE, URBAN RENEWAL In 2016, TLPGS continued on to the next phase of the Hartsville MCBP District Improvements with the work on College Avenue, municipal parking lots, and Mantissa Row alley. The project consisted of capturing under-utilized public parking and converting it into functional, usable space with a dramatic alley connector to help consumers get…
Read MoreLIBERTY STREET – SUMTER SC
LIBERTY STREET – SUMTER SC Liberty Street – Sumter SC
Read MoreFLORENCE STREETSCAPE
FLORENCE STREETSCAPE The LandPlan Group South, in coordination with CDM Smith, was selected by the City of Florence to provide a Streetscape Design and Construction Documents for 10 blocks of Dargan Street, Baroody Street, 1 block of East Evans Street, and 2 blocks of West Evans Street. Current on-going projects with the City include the…
Read More